CGA Excavation Safety Conference and Expo
Home Contact

Measure Twice To Avoid Cuts In Underground Utilities
Date: Wednesday, March 26   Time: 3:00 - 4:00

Presenter(s):
Mark Fleming, Sr. Product Manager, RIDGID


Session Description
Verifying utilities before excavation is a simple practice that can avoid costly delays and down time.
Industries / Areas of Interest:
Gas and Oil  •Water and Sewer  •Fiber / CATV  •Electric  •Damage Prevention  •Locating  •
  Produced by Infrastructure Resources, LLC      •   866-279-7755  • 811 Call 811, Every Dig, Every Time Excavation Safety Guide